Step-by-Step Fix:
-
1
-
2If not, a Gateway upgrade may be required.
-
3
-
4
-
5*DC Bus Voltage Measurement**: Use a calibrated multimeter to measure the DC bus voltage across the Powerwall units (after proper DC disconnect). Ensure the voltage is within the specified range (typically 350-450V DC). NEC 690.17 requires proper disconnect methods for PV systems.
-
6
-
7
-
8*Inspect Wiring**: Visually inspect all wiring connections for tightness, corrosion, and proper termination. Verify the correct polarity of DC connections. Use a torque wrench to ensure connections meet specified torque values.