SolarEdge Hybrid Inverter Error 18xC0 Arc Fault Reset Required

Troubleshoot SolarEdge Error 18xC0: Arc Fault Interruption. Expert guide to reset, diagnose causes, and prevent future arc fault events in residential systems.

Frequently Asked Questions

What are the NEC requirements for rapid shutdown systems in residential PV installations?

NEC 690.12 mandates rapid shutdown for PV systems on buildings. This requires the ability to de-energize PV conductors within a specified distance (typically 1 foot) of the array or inside the building within a short timeframe (e.g., 30 seconds) of initiating rapid shutdown.

How do I test the functionality of the rapid shutdown system on my SolarEdge inverter?

The SolarEdge inverter has a built-in self-test function for the rapid shutdown system. Consult the installation manual for specific instructions on how to initiate the self-test and interpret the results. A successful test confirms proper operation of the rapid shutdown functionality.

What is the recommended torque specification for DC connectors in SolarEdge PV systems?

Refer to the SolarEdge installation manual or the connector manufacturer's datasheet for the correct torque specification. Using the wrong torque can lead to loose connections, overheating, and potential arc faults.