SMA Sunny Island Error 6603: Overload During Backup

Troubleshoot SMA Sunny Island Error 6603 overload in backup mode. Diagnostic steps, safety warnings, and prevention for residential solar+storage.

Frequently Asked Questions

What is the continuous power rating of my SMA Sunny Island?

Refer to the Sunny Island's datasheet for its continuous power rating in AC watts. Ensure your connected loads do not exceed this rating.

How do I perform a battery capacity test?

A battery capacity test involves discharging the battery at a controlled rate and measuring the time it takes to reach a predetermined voltage cutoff. Consult the battery manufacturer's documentation for specific testing procedures and safety precautions.

What is NEC 690.12 and how does it affect my solar system?

NEC 690.12 outlines rapid shutdown requirements for PV systems. It mandates the ability to quickly de-energize the PV array in emergency situations. This may involve installing rapid shutdown devices (RSDs) that disconnect the PV array from the inverter.

Related questions

Loading related questions...

Marcus leads the technical research department at Storage Faults. Together with a team of systems analysts, he specializes in translating complex solar storage error codes into actionable diagnostic steps for the US market.