Diagnostic steps for a cracked Rapid Shutdown Initiator button housing in a residential solar system. Prioritize safety and NEC compliance.
Frequently Asked Questions
•What are the NEC requirements for Rapid Shutdown systems?
NEC Article 690.12 mandates rapid shutdown for PV systems on buildings, limiting voltage to 30V within 30 seconds in controlled areas.
•How do I test the functionality of a Rapid Shutdown system?
Activate the Rapid Shutdown Initiator and measure the PV array voltage at the array disconnect. It should drop below 30V within 30 seconds.
•What type of tools are required to troubleshoot a Rapid Shutdown system?
A calibrated multimeter, clamp meter (AC/DC), infrared thermometer, and appropriate PPE (insulated gloves, safety glasses) are essential.
Related questions
Loading related questions...
Marcus leads the technical research department at Storage Faults. Together with a team of systems analysts, he specializes in translating complex solar storage error codes into actionable diagnostic steps for the US market.