Enphase RSD Hardware Revision Mismatch

Troubleshoot and resolve Enphase RSD hardware revision mismatch errors. Ensure NEC rapid shutdown compliance and system safety in residential solar installations.

Frequently Asked Questions

What are the NEC requirements for rapid shutdown systems in residential solar installations?

NEC 2017 and 2020 mandate rapid shutdown capabilities for PV systems, requiring voltage within the array boundary to be reduced to 30V within 30 seconds of rapid shutdown initiation. This is crucial for firefighter safety.

How do I determine if my Enphase RSD system is compliant with the latest NEC rapid shutdown requirements?

Verify that the system utilizes listed rapid shutdown equipment and that it has been installed according to manufacturer's instructions. Simulate an AC power loss and measure the voltage at the array boundary to confirm that it drops to below 30V within 30 seconds. Consult with a qualified electrician for confirmation.

What are the potential consequences of a hardware revision mismatch in an Enphase RSD system?

A hardware revision mismatch can lead to a failure to properly initiate rapid shutdown during an emergency, potentially exposing firefighters or other personnel to dangerous high voltages. It can also result in system downtime and reduced energy production.