Frequently Asked Questions
•What are the acceptable voltage tolerances between battery modules in a parallel EG4 server rack system?
Typically, the voltage difference between modules should not exceed 0.1-0.2 V. Greater deviations indicate potential issues within the module or its connections.
•How often should capacity tests be performed on EG4 server rack battery modules?
Capacity tests are recommended every 6-12 months in high-usage commercial/industrial applications. More frequent testing may be necessary if performance degradation is suspected.
•What are the common causes of premature battery degradation in EG4 server rack systems?
Common causes include operating the batteries outside of their specified temperature range, exceeding charge/discharge current limits, and prolonged operation at extreme State of Charge (SOC) levels.