EG4 18KPV SoC Stuck at 50% with BMS Communication Failure

EG4 18KPV inverter showing SoC stuck at 50% with BMS communication failure. Troubleshoot battery SOC inaccuracies, communication errors, and safety.

Frequently Asked Questions

How do I check the CAN bus termination resistance?

Use a multimeter to measure the resistance between the CAN High and CAN Low wires with the system powered down. It should be approximately 120 ohms.

What is the correct start-up sequence for the EG4 18KPV?

Typically, the correct sequence is: 1. Battery ON, 2. Inverter ON, 3. Solar DC disconnect ON, 4. AC Grid Breaker ON. Refer to the EG4 manual for specific instructions.

Where can I find the latest firmware updates for the EG4 18KPV?

Firmware updates are typically available on the EG4 website or through their monitoring app. Contact EG4 support for assistance with firmware updates.